SEWER CCTV Guidebook

INTRODUCTION

Sewerage systems are essential to maintain a high standard of public health. In Singapore, it is also an important part of the “Water loop” to reclaim our precious water resources. To keep the sewerage system functioning well, it is important to ensure that sewers are in good condition and pipe deterioration and damages are identified early and rectified. This is done primarily through CCTV assessment of sewer condition.

This Sewer CCTV Guidebook (SCG) is intended as a guide on registration with PUB for CCTV contractors and the standard procedures of CCTV creation and submission.

This 2017 edition of SCG incorporate changes over the years to address new technical challenges and emerging issues facing the industry. It incorporates guidelines on a new online submission system developed based on feedback from the industry. The new system will manage the whole life cycle of sewer CCTV from recording to submission, processing and finally archival in a shared “cloud” database. This has done away with costly production of DVDs and hardcopy submissions by contractors and will result in much efficiency gains, improved operations and planning and cost savings to both contractors in the sewer CCTV industry and PUB.

Registered CCTV Contractors

1.

Background

PUB began registration for sewer pipelines’ CCTV contractors from June 2012 and from 1 Jan 2013, only registered contractors were permitted to conduct CCTV inspection works. Members of the public have been informed to use only registered CCTV contractors as reports submitted by unregistered contractors to PUB will be rejected. This effort aims to ensure the safety of CCTV inspection in sewers, improve the standard of sewer assessment/reporting and prevent malpractices.

2.

Role of Registered CCTV Contractor

Registered CCTV contractors shall fulfil the following roles:

  1. Have sufficient qualified and competent site staff to carry out sewer CCTV and report condition of sewers correctly and accurately;

  2. Have CCTV equipment that produces CCTV that meets the submission requirements; and

  3. Submit CCTV condition assessment to PUB on behalf of client’s doing work that affect public sewers.

3.

Primary Responsibility

Registered CCTV contractors shall:

  1. maintain an impartial and professional responsibility to reflect the true condition of the sewer assessed. Any falsification of CCTV records and/or collusion with any party to not reflect the true condition in the sewer assessment or use fabricated CCTV records will result in action to terminate the registration of the contractor;

  2. ensure the safety of his workers at all times when working in the sewer environment by abiding with all conditions of entry into confined spaces of the sewerage system and all governing Bizsafe requirements; and

  3. safeguard the sewerage system and maintain the flow and operation of the sewers at all time while carrying out CCTV operations. It is an offence for any person to carry out works in the public sewerage system without PUB’s approval.

4.

Registration and Validity

Any CCTV contractor who wishes to register with PUB must meet the requirements on BizSafe Certification and have competent staff as set out in part 5 and 6 respectively. The Registration form and list of documents required are shown in in Annex A. Successful applicants will be listed on PUB’s website at www.pub.gov.sg. The registration is valid for three years and will lapse automatically unless renewed. Registration renewal shall be made one month before the expiry of the validity period.

5.

BizSafe Certification

All applicant/contractor company must possess at least BizSafe Level 3 Certification awarded by Workplace Safety and Health Council (WSHC) or equivalent.

6.

Competency/Proficiency

The applicant shall provide details of qualified staff both for the sewer condition assessment by CCTV and site supervisors to carry out the works in the sewers. Please note that staff whose name is submitted for registration must be employed full-time and cannot be employed by another company even if the companies are related (e.g. subsidiary, holding company). All applicants/contractors must employ one or more competent staff who possess the following certifications:

  1. Certificate of Proficiency in Sewer & Manhole Cleaning; and

  2. Either one of the following:

    • Certificate of Competency in Water Research Company, plc UK (WRc) Sewer Pipeline Assessment and Certification Course (conducted by VSEA Engineering Solutions Pte Ltd);

    • Certificate of Proficiency in Sewer Pipeline Assessment Certification Programme conducted by SgSTT for both Part 1 on CCTV Inspection of sewer and Part 2 on Interpretation of CCTV videos and preparation of Reports;

    • Workforce Skills Qualifications (WSQ) on Certified Used Water Collection Technician

7.

Deregistration and Suspension of Registration

PUB may de-register or suspend the registered contractor for a period of up to 12 months if the contractor fails to meet the requirements set out under the Terms of Registration, or if the contractor commit any of the following:

  1. contravenes any Safety Acts and the Sewerage & Drainage Acts and regulations while carrying out the CCTV inspection works;

  2. fails to submit Form B (Application to Work in Public Sewerage System);

  3. submits inaccurate/false CCTV inspection reports to PUB.

PUB may publish the names of the de-registered/suspended contractors in the PUB website. The contractor will only be allowed to re-register with PUB after the suspension is lifted.

8.

Updating PUB

Registered contractors are required to advise PUB immediately of any changes in its management status, address (mailing and email addresses) or any other pertinent change of particulars in writing and accompanied by copies of supporting documents.

The following officers will help provide clarification on registration matters:

9.

Registered CCTV Contractors List

The current list of PUB registered CCTV contractors can be seen in PUB website: https://www.pub.gov.sg/usedwater/registrationofcctvcontractor

Online Sewer CCTV Submission System

From 1 Oct 2017, all PUB registered CCTV contractors will be required to submit their CCTV videos and reports using the new online sewer CCTV Management System at the website at https://www.sewercctv.pub.gov.sg/login.

What the new online system means to you:

  1. Cost savings

    With online submission, there is no need to print your Sewer Assessment Reports or create DVDs of the CCTV or mail them to PUB. All these will be created and submit online at no additional cost to your initial creation of the CCTV record in your CCTV recording system.

  2. Convenience

    You will be able to make online CCTV video and report submissions any time and from any remote site location with internet access, as and when the CCTV record and condition is assessed or at your own convenience in your office subsequently.

  3. Faster Response

    Your submitted files will be auto-validated by the system. The system will tell you what is lacking if it fails the validation test. PUB having the same online access can start to process your submission once it is validated.

  4. Improved experience

    With an online management system, you can view all CCTV submissions made by you and receive instant notifications, as soon as your submission has been reviewed by our staff. You will be able to view our comments, as well as made re-submissions for the rejected sections only.

How to start using the online CCTV submission system?

A step-by-step document has been prepared, to facilitate you in using the website. You may refer to the details of each section in the Annex G.

Sewer/Manhole CCTV Inspection Requirements

General Requirements

  1. In the CCTV report, descriptions of defects and abnormalities in the manholes and sewers shall be described fully. Defects’ classification shall be presented in accordance with the WRc/WAA "Manual of Sewer Condition Classification" 5th Edition or the latest edition. Guidance notes on WRc defect classification is provided in Annex B. Please refer www.wrcplc.co.uk for the complete WRc/WAA manual.

  2. All CCTV inspection reports shall be prepared by the competent person registered as the staff of the registered contractor. The CCTV reports shall follow the requirements listed below.

    Note: CCTV report/submissions that do not comply with the requirements will be rejected.

Preparation before CCTV Inspection

  1. QP/contractor shall submit Form B to PUB to obtain the permission before entering any public sewer to carry out any works, inspection or CCTV sewer inspection. Failure to obtain permission from PUB is a violation of the Sewerage and Drainage Act. Offenders are liable for enforcement actions. Form B is an online form accessible at PUB Website

    (https://bpu.pub.gov.sg/Forms/EForms/Instruction?form=FormB)

  2. CCTV contractors shall obtain permission to enter manholes in private properties. PUB may assist to issue letter of request if necessary. PUB may also instruct the CCTV contractor to carry out CCTV from an alternative manhole.

  3. Pipelines/manholes/inspection chambers shall be hydraulically cleaned before inspection. This is to enable existing defects to be clearly recorded on video. CCTV contractor shall re-clean and re-inspect the sewer or manhole if the recorded view is obstructed or not clear.

  4. All cleaning of public sewer shall be carried out by qualified operators certified in Sewer and Manhole Cleaning for Operator and Supervisor course (by SgSTT) or Operate a High Pressure Water Jetting System to Clean Pipelines and Appurtenances (WSQ). If sewer inspection cannot be carried out due to surcharge flow condition even after flushing/hydraulic cleaning, report the sewer to PUB WRN Ops Centre at 62894013.

  5. CCTV contractors shall use supporting methods such as soap/dye test to verify existing drain line connection during the pre-con and/or post con CCTV works to confirm point of connection.

CCTV Recording

  1. All CCTV recording shall be carried out using full feature pan, tilt, and zoom (PTZ) 5 camera. For sewers larger than 450mm diameter, the zoom feature shall be used to allow clear interpretation of all defects and its severity. Push Rod cameras may be used only in special cases when approved by PUB.

  2. CCTV recording shall be done from manhole-to-manhole. In CCTV recording for single landed housing development, CCTV may commence from the entering manhole and end at the boundary. Each recording shall be on a separate file. To locate the defect position correctly, the meter reading of the recording shall be set to zero when the CCTV camera is at the invert level of the starting manhole.

  3. CCTV recording and inspection should be conducted in the direction of sewer flow. If necessary to inspect the sewer against the flow, the reason for doing so shall be reported. CCTV recording should preferably be done when water level in the sewer is less than 30% of full bore and the camera is kept above water near the central axis of the sewer.

  4. The travel speed of the CCTV unit in the sewer/manhole shall be limited to 0.20 m/s during recording to enable details to be clearly recorded. The CCTV recording shall be free of background noise and artifacts. Digital video recording shall be at the same speed that it was recorded.

  5. When inspecting sewers, the sewer condition assessment shall follow the WRc Defect classification and condition codes. Photographic evidence of each defect must be taken and included in the CCTV Inspection Report with its location indicated.

  6. When inspecting a manhole, operator shall pay attention to the following structural defects:

    1. Damaged manhole frames and/or covers (including rocking manholes)

    2. Signs of inflow/infiltration/exfiltration from the manhole walls

    3. Damaged to intermediate platform and benching

Information on CCTV Record

  1. In the Sewerage Information Plan (SIP), each manhole and sewer are given a unique identification number (ID). These IDs must be included in all CCTV inspection reports, photographs and videos.

  2. The main title of survey in the video summary page to indicate US or DS direction if CCTV survey is done in both directions. This is to tally with the survey direction in CCTV video screenshots.

  3. The following information shall be captured on site and displayed at the start of the CCTV recording for a minimum of 15 seconds. All text displayed in the video shall not block the main visual and shall not be in coloured text boxes. This data should not be inserted or tempered with in post-production editing.

    • Project Reference Number/Contract Number/Works Order Number:

    • Type of Survey: Pre-Con / Post-Con / Before Defect Liability Period (DLP) / End DLP / Post Repair

    • Sewer ID

    • Upstream and downstream manhole IDs

    • Sewer pipe diameter

    • Sewer pipe material

    • Direction of unit travel

    • Road name/location

    • Date and time of survey

    • CCTV company name

    • Upstream and downstream (or “from” and “to”) manhole ID of inspected pipe segment

    • Automatic update of the unit's chainage position in the pipeline from adjusted zero

  4. The following information shall be displayed for the CCTV footage after the header.

    • Project Reference Number/ Contract Number/Works Order Number:

    • Type of Survey: Pre-Con / Post-Con / Before DLP / End DLP / Post Repair

    • Sewer ID

    • Upstream and downstream manhole IDs

    • Sewer pipe diameter

    • Sewer pipe material

    • Direction of unit travel

    • Road name/location

    • Date and time of survey

    • Upstream and downstream (or “from” and “to”) manhole ID of inspected pipe segment

    • Running footage (distance travelled in meter)

  5. The following information shall be displayed for the CCTV ending footage for at least 15 seconds:

    • Project Reference Number/ Contract Number/Works Order Number:

    • Type of Survey: Pre-Con / Post-Con / Before DLP / End DLP / Post Repair

    • Sewer ID

    • Upstream and downstream manhole IDs

    • Sewer pipe diameter

    • Sewer pipe material

    • Direction of unit travel

    • Road name/location

    • Date and time of survey

    • Upstream and downstream (or “from” and “to”) manhole ID of inspected pipe segment

    • Ending footage

Submission Format

  1. All documents (PDF reports, video and image files) should be submitted online via VeMo at https://www.sewercctv.pub.gov.sg/login.

  2. Submission format of video and image should only be in MP4 with the codec listed in MPEG-4 Part 10 with minimum resolution of 640 × 480 and in JPEG/GIF/PNG or BMP formats. Maximum submission size (including all videos and reports) shall not be more than 3GB. [MP4V and XVID codec are not supported.]

  3. For each manhole inspected,

    1. there should be 2 image files of the manhole. One showing far view of the manhole location and the other showing the channels inside the manhole. The naming of the image files should be:

      • Manhole ID-survey date (mmddyy) for far view of the manhole image. For example: 244988-042415

      • Manhole ID-survey date (mmddyy)-Benching for channel image inside the manhole. For example: 244988-042415-Benching

    2. CCTV recordings and report to clearly show circumferential condition of all incoming and outgoing pipes.

  4. For each sewer inspected, there should be an image file showing the pipe face of the sewer (ie. at 0m). The naming of the image file should be sewer ID-survey date (mmddyy)-S.

    For example: 123456-123117-S

  5. The naming convention for the CCTV survey inspection report and video are shown below:

    1. Sewer CCTV survey video and pdf report (File name: Sewer ID-mmddyy-Pre Con / Post Con / Post Repair / Before DLP / End DLP*-US*).

      Example: 123456-123117-Post Con-US/DS

      Naming Convention

      Description

      Sewer ID

      Sewer ID being inspected

      Mmddyy

      Survey date

      Pre-Con/Post-Con/Post-Repair/Before DLP/End DLP*

      *Select the type of survey

      US/DS

      Survey Direction if both US and DS direction is surveyed

    2. Manhole CCTV survey video and pdf report (File name: Manhole ID-mmddyy-Pre Con / Post Con / Post Repair/ Before DLP / End DLP*-US*).

      Example: 123456-123117-Post Con

      Naming Convention

      Description

      Manhole ID

      Manhole ID being inspected

      Mmddyy

      Survey date

      Pre-Con/Post-Con/Post-Repair/Before DLP/End DLP*

      *Select the type of survey

    3. For CCTV video to the connection from the last IC to the public sewer, the video file name should be last IC to sewer/manhole ID. For example: last IC to 244999.

  6. The naming convention for the image files in the CCTV survey inspection report as follows:

    1. For sewer report 1st image file name: SewerID-MMDDYY-S1, 2nd file name: SewerID-MMDDYY-S1, 3rd file name: SewerID-MMDDYY-S2, ...

    2. For manhole report 1st image file name: ManholeID-MMDDYY-M1, 2nd file name: ManholeID-MMDDYY-M1, 3rd file name: ManholeID-MMDDYY-M2, ...

    3. For inspection chamber report 1st image file name: LastIC-MMDDYY-1, 2nd image file name: LastIC-MMDDYY-2, 3rd file name: LastIC-MMDDYY-3, ...

    4. For drainline report 1st image file name: LastIC to SewerID/ManholeID-MMDDYY 1, 2nd file name: LastIC to SewerID/ManholeID-MMDDYY-2, 3rd file name: LastIC to SewerID/ManholeID-MMDDYY-3, ...

  7. Any errors in recording, CCTV imagery, unclear video footage and/or error in interpretation of the sewer(s) and/or manhole(s) defect, will be rejected.

Reports for Submission

  1. Registered CCTV contractor shall ensure that reports to be submitted are in colour. The minimum size of the video screenshots shall be 100mm × 75mm.

  2. Video screenshots shall be produced in the following circumstances:

    1. All suspected defects and abnormalities which may include:

      • sewer pipes fractures, broken, collapse, deformation, displaced, sunken, infiltration, pipes with sever joint displacement and abnormalities,

      • sewer liners suffering from peeling, deformation, bulging, broken, collapse, obstruction etc.,

      • lateral openings where there is accumulation of debris at particular localized spots etc. that the CCTV specialist comes across during the CCTV assessment.,

      • Where there are bends/kinks/drops found in the drain-line connection or sewer during the CCTV survey, please indicate clearly in the report.

    2. Where a defect is continuous or repeated, the screenshots shall be taken at the beginning of the defect and at not less than 5m intervals thereafter.

    3. For a generally good condition sewer (i.e. no evidence of defects or abnormalities etc.), video screenshots shall be taken for every 15m interval of the sewer.

  3. To describe degree of mortar loss, size of a crack or facture, size of a void or any other quantifiable defect, you may refer to Annex B as a guide.

  4. Where a video screenshot is taken to illustrate a specific defect, it shall occupy the central part of the screen and be in focus. CCTV contractors shall ensure that all submissions of all videos and photographs are of good clarity.

  5. Registered CCTV contractor shall ensure all pages in the reports shall be clearly identified and systematically annotated (typed) in relation to the following:

    1. Sewer and manhole IDs

    2. Date & Time of the inspection

    3. Chainage defect

    4. Type of defect

    5. Defect code

  6. You may refer to the attached sample report in Annex C and D.

  7. Where CCTV reports are prepared for pre or post construction survey of a development work, registered CCTV contractor should include photos (with date stamp) of the sewer alignment and manholes affected the development site and the surrounding development site including project sign board (Please see Annex E for sample report.

Annex A - Registration Form and Terms of Registeration for CCTV Contactors

Registration Form for CCTV Contractors

Instructions

Please complete the registration form and submit to:

WATER RECLAMATION (NETWORK) DEPARTMENT

OPERATION AND MAINTENANCE DIVISION

NETWORK MANAGEMENT BRANCH

82 TOH GUAN ROAD EAST, #C3-08

SINGAPORE 608575

TEL: 6517 2215 / 6517 2221

Declaration

I, ___________________________________________________________ (Company Representative) _______________ (NRIC/Passport No.) of ________________________________ (Company Name) declare that the particulars stated in this registration form and the attachments are true and correct to the best of my knowledge and belief, and that I have not wilfully suppressed any material facts.

I confirm that I have read and understood PUB Terms of Registration before completing this Registration Form.

Section A: Company Information (Attach bizSafe Level 3 Certificate or higher)

Name of Company

Business Address

Postal Code

Office No

Fax No

ACRA Reg No

Email Address

BizSafe Expiry Date (dd/mm/yyyy)

*delete accordingly

Section B: Competent Personnel

(Attach photocopy of IC/Passport, Academic and Competency Certificates)

Personnel No 1

Full Name (As of NRIC/Passport)

NRIC/Passport No.

Designation

Contact No

Education History

S/N

Institution

Period (year)

Qualification attained

1

From

to

2

From

to

3

From

to

4

From

to

5

From

to

CCTV Work-related Experience

S/N

Company Name

Period

Designation

1

year

month

2

year

month

3

year

month

4

year

month

5

year

month

Certificates of Competency/Proficiency (Tick accordingly EITHER option 1 OR 2 AND option 3)

S/N

Name of Certificate

Tick

1a

CCTV Inspection of Sewer (SgSTT)

1b

Interpretation of CCTV videos and Preparation of Reports (SgSTT)

2

Certificate of Competency in WRc (VSEA Engineering Solutions Pte Ltd)

3

Sewer and Manhole Cleaning (SgSTT)

*delete accordingly

Personnel No 2

Full Name (As of NRIC/Passport)

NRIC/Passport No.

Designation

Contact No

Education History

S/N

Institution

Period (year)

Qualification attained

1

From

to

2

From

to

3

From

to

4

From

to

5

From

to

CCTV Work-related Experience\

S/N

Company Name

Period

Designation

1

year

month

2

year

month

3

year

month

4

year

month

5

year

month

Certificates of Competency/Proficiency (Tick accordingly EITHER option 1 OR 2 AND option 3)

S/N

Name of Certificate

Tick

1a

CCTV Inspection of Sewer (SgSTT)

1b

Interpretation of CCTV videos and Preparation of Reports (SgSTT)

2

Certificate of Competency in WRc (VSEA Engineering Solutions Pte Ltd)

3

Sewer and Manhole Cleaning (SgSTT)

*delete accordingly

Section C: Equipment List

Provide specification of your equipment. You may submit more than one for each equipment.

(Attach catalogue of equipment)

  1. CCTV Camera

    CCTV Camera No: ____

    1. Make / Model: ________________

    2. Camera manufactured date: _____________ (dd/mm/yyyy)

    3. Country of Origin: ________________

    4. Overall Dimension

      Length (mm): ________ Width (mm): ________ Height (mm): ________

    5. Explosion Proof / Intrinsically Safe: Yes / No* Certified by: ________________

    6. Optical Zoom: x _______

    7. Camera resolution: NTSC (720 x 426 pixels) / PAL (720 x 576 pixels) / HD (1280 x 720 pixels)*

    8. Illumination

      1. No of lamps: _______

      2. Intensity: __________ lumen

    9. Pan: Yes / No* Tilt: Yes / No*

      Pan Range: ± ________⁰ Tilt Range: ± ________⁰

    10. Inclinometer: Yes / No*

      Accuracy: ± 0.01⁰ / ± 0.1⁰ / ± 1⁰*

    11. Capable to perform in pipeline of range from _________mm to __________mm

*delete accordingly

  1. CCTV Camera

    CCTV Camera No: ____

    1. Make / Model: ________________

    2. Camera manufactured date: _____________ (dd/mm/yyyy)

    3. Country of Origin: ________________

    4. Overall Dimension

      Length (mm): ________ Width (mm): ________ Height (mm): ________

    5. Explosion Proof / Intrinsically Safe: Yes / No* Certified by: ________________

    6. Optical Zoom: x _______

    7. Camera resolution: NTSC (720 x 426 pixels) / PAL (720 x 576 pixels) / HD (1280 x 720 pixels)*

    8. Illumination

      1. No of lamps: _______

      2. Intensity: __________ lumen

    9. Pan: Yes / No* Tilt: Yes / No*

      Pan Range: ± _______⁰ Tilt Range: ± _______⁰

    10. Inclinometer: Yes / No*

      Accuracy: ± 0.01⁰ / ± 0.1⁰ / ± 1⁰*

    11. Capable to perform in pipeline of range from _________mm to __________mm

*delete accordingly

  1. Sonar

    Sonar No: ____

    1. Make / Model: ________________

    2. Camera manufactured date: ____________ (dd/mm/yyyy)

    3. Country of Origin: ________________

    4. Overall Dimension

      Length (mm):_______ Width (mm):_______ Height (mm): _______

    5. Explosion Proof / Intrinsically Safe: ________________ Certified by: __________________

    6. Capable to perform in pipeline of range from _________mm to __________mm

    7. Operating frequencies (kHz): ___________ to ____________

    8. Minimum detectable range (mm): ___________

*delete accordingly

  1. Crawler

    Crawler No: _____

    1. Make / Model: ________________

    2. Crawler manufactured date: ____________ (dd/mm/yyyy)

    3. Country of Origin: ________________

    4. Overall Dimension

      Length (mm):_______ Width (mm): _______ Height (mm): _______

    5. Explosion Proof / Intrinsically Safe: ________________ Certified by: _________________

*delete accordingly

  1. Accessories

    1. Laser Profiler

      Laser Profiler: Yes / No*

      Make / Model: ________________

      Laser Point: 1 / 2 / 3*

    2. Cable Reel

      Make / Model: ________________

      Maximum length (m): _________

*delete accordingly

Annex B - WRc Defect Classification (MSCC 5)

WRc Defect Classification – Manual of Sewer Condition Classification (MSCC) 5th Edition

Grading of the internal condition of the pipe

Condition Grade

Description

1

  • Structural Condition: Any cracking limited to surface cracks. Plastic pipe deformation < 5% of the diameter.

  • Service Condition: Unobstructed (no impedance to flow).

    Structural Condition: No defects.

    Service Condition: Clear.

2

  • Structural Condition: Circumferential or longitudinal crack. Medium (estimated 1 to 1.5x pipe thickness) open or displaced joint. Slight wear or spalling. Plastic pipe deformation 5 to < 10% of the diameter. Evidence of previous repair.

  • Service Condition: Fine roots, ballast, silt or other deposits < 5% of CSA. Intruding lateral < 5% diameter. Sealing ring visible. Vermin present. Standing water < 20% CSA due to pipe deviation.

    Structural Condition: Superficial defects.

    Service Condition: Superficial deposits with no loss of capacity.

3

  • Structural Condition: Multiple or spiral cracks. Circumferential or longitudinal fracture. Deformation < 5% (rigid) or 10 to < 20% (plastic) of the diameter. Large (estimated >1.5x pipe thickness) open or displaced joint. Medium wear or spalling (e.g. visible aggregate). Puncture on inside wall (twin wall).

  • Service Condition: Root mass < 20% CSA, or scale deposits < 20% CSA, or ballast, silt or other deposits 5 to < 20% CSA. Intruding lateral 5 to < 20% diameter. Sealing ring intruding. Seeping infiltration into non-porous or unperforated pipes.

    Structural Condition: Minor defects.

    Service Condition: Capacity slightly reduced.

4

  • Structural Condition: Multiple or spiral fractures or broken. Deformation 5 to 10% (rigid) or 20 to 33% (plastic) of the diameter. Severe wear or spalling (e.g. missing aggregate). Split on inside wall (twin-wall). Defective repair < ¼ of radius.

  • Service Condition: Tap roots or root mass 20 to < 50% CSA. Scale deposits 20%+ CSA. Ballast, silt or other deposits 20 to < 75% diameter. Intruding lateral 20 to < 75% diameter. Sealing ring broken or hanging above centre. Dripping infiltration into non-porous or unperforated pipes. Standing water 20 to < 75% CSA due to pipe deviation.

    Structural Condition: Major defects.

    Service Condition: Capacity severely reduced.

5

  • Structural Condition: Already collapsed or deformation > 10% (rigid) or > 33% (plastic) of the diameter. Extensive missing fabric. Split in inner and outer walls (twin-wall). Reinforcement defective. Defective connection. Open joint or hole with visible soil or void. Defective repair ¼+ of radius.

  • Service Condition: Root mass 50%+ CSA or other blockage/obstacle present. Ballast, silt or other deposits 75%+ CSA. Intruding lateral 75%+ diameter. Sealing ring hanging below centre. Steady infiltration into non-porous unperforated pipes. Standing water 75%+ CSA due to pipe deviation. Blocked perforations.

    Structural Condition: Not fit for purpose or unsafe.

    Service Condition: Blocked or unsafe condition.

For structural grading, the worst defect along the individual sewer length is used to give a single condition grade for that particular sewer length, i.e. the grade for the sewer length is based on the highest internal condition score along the sewer length.

For service grading, the pipe length is assigned one of five service condition grades according to either where the peak score or the mean score gives the highest grade.

Observation Codes

The MSCC observation codes are divided into four classes:

  • Structural – codes that describe the physical condition of the pipe fabric.

  • Service – codes that describe deficiencies in the hydraulic performance of the pipe.

  • Construction – codes that illustrate the constructions assets of the sewer.

  • Miscellaneous – other codes that do not fit into any of the 3 previous classes.

Only structural and service codes are scored, and not all are scored in each class.

Service codes are universal and can be used across all pipe material types. Some structural codes may only be used for brick/masonry conduits, and similarly for piped assets.

Any code containing a ‘J’ is deemed to be ‘at a joint’. This indicates that the observation is at a joint by definition, or it is within 200mm either side of the joint. The ‘J’ modifier is optional on many codes.

Any code description containing the word ‘other’ requires a mandatory comment against the code entry.

Structural All

CC(J) Crack, circumferential

CM(J) Cracks, multiple

CR Cracks, radiating

CS(J) Crack, spiral

FL(J) Fracture, longitudinal

FC(J) Fracture, circumferential

FM(J) Fractures, multiple

FR Fractures, radiating

FS(J) Fracture, spiral

CL(J) Crack, longitudinal

SW Surface damage, increased roughness

SS Surface damage, spalling

SB Surface damage, internal blister or bulge

SAV Surface damage, aggregate visible

SAP Surface damage, aggregate projecting

SRV Surface damage, reinforcement visible

SRP Surface damage, reinforcement projecting

SRC Surface damage, reinforcement corroded

SCP Surface damage, corrosion products

SZ Surface damage, other

Structural Pipe

B(J) Broken

H(J) Hole

D Deformed

JD Joint displaced

JDM Joint displaced, medium

JDL Joint displaced, large

OJ Open joint

OJM Open joint, medium

OJL Open joint, large

XP Collapsed pipe

Structural Brick/Masonry

DB Displaced bricks

MB Missing bricks

MM Missing mortar

MMS Missing mortar, slight

MMM Missing mortar, medium

MML Missing mortar, large

DI Dropped invert

DV Deformed, vertically

DH Deformed, horizontally

XB Collapsed brickwork/masonry

Service

RF(J) Roots, fine

RT(J) Roots, tap

RM(J) Roots, mass

IS(J) Infiltration, seeping

ID(J) Infiltration, dripping

IR(J) Infiltration, running

IG(R) Infiltration, gushing

EX(J) Exfiltration

DEE(J) Attached deposits, encrustation

DEF(J) Attached deposits, fouling

DEG(J) Attached deposits, grease

DEZ(J) Attached deposits, other

DES(J) Settled deposits, fine

DER(J) Settled deposits, coarse

DEC(J) Settled deposits, hard or compacted

DEX(J) Settled deposits, other

ING(J) Ingress of soil

INGS(J) Ingress of sand

INGP(J) Ingress of peat

INGF(J) Ingress of fine material

INGG(J) Ingress of gravel

INGZ(J) Ingress of other material

OBB Obstacles, brick or masonry in invert

OBM Obstacles, pipe material in invert

OBX Obstacles, other object in invert

OBI Obstacles, protruding through wall

OBC Obstacles, through connection or junction

OBP Obstacles, external pipe or cable

OBS Obstacles, built into structure

OBZ Obstacles, other

WL Water level

WLC Water level, clear

WLT Water level, turbid

LL Line deviates, left

LR Line deviates, right

LU Line deviates, up

LD Line deviates, down

Construction

JN Junction

JNC Junction, closed

LCxxx Lining change (add material code)

MCxxx Material change (add material code)

PC Pipe unit length change

SCxxx Pipe shape change (add shape code)

SC Size change

CN Connection

CNC Connection, closed

CX Defective connection

CXI Defective & intruding connection

CXP(I) Defective connection, position incorrect

CXD(I) Defective connection, damaged

CXB(I) Defective connection, blocked

CXZ Defective connection, other

JX Defective junction

JXP Defective junction, position incorrect

JXD Defective junction, damaged

JXB Defective junction, blocked

JXZ Defective junction, other

SR Sealing ring, intruding

SRB Sealing ring, intruding & broken

SO Other sealant, intruding

LXD Lining defect, lining detached

LXC Lining defect, discoloured

LXE Lining defect, defective end

LXWL Lining defect, longitudinal wrinkling

LXWC Lining defect, circumferential wrinkling

LXWH Lining defect, spiral wrinkling

LXWM Lining defect, multiple wrinkling

LXB Lining defect, blistering or bulge

LXZ Lining defect, other

LXCX Lining defect, at connection

LXEB Lining defect, external bulge

LXES Lining defect, end not sealed

LXF Lining defect, separated film

LXH Lining defect, hole in lining

LXR Lining defect, resin missing

LXS Lining defect, crack, split or weld failure

LXSC Lining defect, circumferential crack, split or weld failure

LXSH Lining defect, spiral crack, split or weld failure

LXSL Lining defect, longitudinal crack, split or weld failure

LXSM Lining defect, multiple cracks, splits or weld failures

LXSF Lining defect, soft lining

LXSS Lining defect, separated seam cover

RXM Defective repair, part of wall missing

RXC Defective repair, crack in material

RXH Defective repair, hole in material

RXMR Defective repair, missing mortar material

RXS Defective repair, separation from host pipe

RXXM Defective repair, excessive material condtruvtion

RXZ Defective repair, other

WXL Weld failure, longitudinal

WXC Weld failure, circumferential

WXS Weld failure, spiral

RPR Point repair, pipe replaced

RPL Point repair, localised lining

RPI Point repair, injected mortar

RPS Point repair, other injected sealing material

RPH Point repair, hole repaired

RPC Point repair, other repair to connection

RPT Point repair, localised lining of connection

RPZ Point repair, other

PP Porous pipe material

SV Soil visible beyond defect

VV Void visible beyond defect

MH(F) Start/finish manhole

IC(F) Start/finish inspection chamber

RE(F) Start/finish rodding eye

LH(F) Start/finish lamphole

OF(F) Start/finish outfall

BN(F) Start/finish buchan trap

CP(F) Start/finish catchpit

GY(F) Start/finish gully

OS(F) Start/finish oil separator

SK(F) Start/finish soakaway

WR(F) Start/finish winser trap

BR(F) Start/finish branch connection

OC(F) Start/finish other chamber or node

Miscellaneous

SA Survey abandoned

REM General remark

FW Flow from incoming pipe

FWC Clear flow from incoming pipe

FWCS Wrong clear flow from incoming pipe

FWT Turbid flow from incoming pipe

FWTF Wrong turbid flow from incoming pipe

OD Hazardous atmosphere, oxygen deficiency

HS Hazardous atmosphere, hydrogen sulphide

ME Hazardous atmosphere, methane

GZ Hazardous atmosphere, other

CUW Loss of vision, camera under water

CUD Loss of vision, due to silt

CUS Loss of vision, due to steam

CUZ Loss of vision, due other reason

Annex C - Sample CCTV Sewer Inspection Report

Annex D - Sample CCTV Manhole Inspection Report

Annex E – Sample Report on Surrounding Development Site

NEW REQUIREMENTS

Project Signboard

Note: 1 photo of the project signboard should be complied only to the first manhole report

Photo of Manhole (Start) and Sewer Alignment

Note: 1 photo of sewer alignment, flow direction (marked red) and construction site (marked blue) to be marked approximately in the photo using an arrow line (width 4pt) by identifying the entering manhole. This report to be compiled together in every manhole report. Date of the photo taken to be reflected.

Annex F – Sample Images to be Uploaded

  1. Far view of Manhole

  2. Manhole Benching or Channel

  3. Sewer Pipe Face

Annex G - CCTV Online Submission System User Guide

1.

INTRODUCTION

This document contains all essential information for the “Contractor Users” to make full use of the CCTV Online System. This document includes a description of the system functions and capabilities and step by-step procedures for system access and use. Where possible, images/graphics will be used for better illustrations.

This document may be subjected to alterations as the project/system introduces new functions or new ways to perform a task/action.

1.1

Primary Functions of the System

The primary function of the CCTV Online system is to facilitate the submission and processing of Survey reports (forms, reports, videos and images) by the Contractors to PUB officers. The system is an online system, which aims to eliminate the needs to transport Survey reports (forms, reports, videos and images) in the form of physical documents or physical harddisks/DVDs.

With an online CCTV submission system, all stakeholders (Contractors and PUB officers) can refer to their submissions online, which greatly increases the efficiency in the entire process.

2.

GENERAL FUNCTIONS

Below sections contains the step-by-step guide on performing general functions in the system.

2.1

User Account

This section contains the guide for user account related functions.

Below is how the account is structured for Contractors:

Figure 1: Contractor User Account (Hierarchy)
Figure 1: Contractor User Account (Hierarchy)

There are two (2) types of user accounts (roles) for contractors, namely:

  • Contractor Administrator

  • Contractor User

Roles

Description

Contractor Administrator

Contractor administrator has administrative function to manage the users in the Contractor Company account.

Contractor User

Contractor user has the functionalities to create, view, resubmit and withdraw submissions.

You may refer to section 3 Contractor Administrator Functions for more details on how to manage the users in the Contractor Company account.

Note:

  • There is a limit of three (3) users per contractor company configured in the system. Should you require more, this may be increased with PUB’s approval.

2.1.1

Login

Go to http://www.sewtv.sg to access the PUB Online CCTV system. Below is the landing page.

Figure 2: Landing Page
Figure 2: Landing Page

Step 1: Click on the “LOG IN” button and you will be redirected to the login page.

Figure 3: Login Page
Figure 3: Login Page

Step 2: Enter the ID / Password that you have set for yourself.

Note:

  • Your user account is created by your company’s administrator. Please contact him/her accordingly for account creation matters. Your password will be emailed to you upon account creation by your company administrator.

Step 3: Click on the “LOG IN” button to proceed to login.

Upon successful login, you will be redirected to the dashboard for your company.

Figure 4: Contractor Company Dashboard
Figure 4: Contractor Company Dashboard
2.1.2

Logout

To log out of the system, you may follow the steps below.

Step 1: At the Top Menu Bar, click on the “User” icon.

Figure 5: Top Menu Bar
Figure 5: Top Menu Bar

Step 2: The “My Profile” page will popup. Click on the “Logout” button to proceed to logout.

Figure 6: My Profile Page (Logout)
Figure 6: My Profile Page (Logout)

Upon successful logout, you will be redirected to the login page.

Note:

  • The system will automatically logout the user if there is inactivity for thirty (30) mins or more.

2.1.3

Change Password

The system provides the self-service function for users to change their own password.

Step 1: Login to the system with your id/password.

Step 2: At the Top Menu Bar, click on the “User” icon.

Figure 7: Top Menu Bar
Figure 7: Top Menu Bar

Step 3: The “My Profile” page will popup. Click on the “Change Password” button.

Figure 8: My Profile Page (Change Password)
Figure 8: My Profile Page (Change Password)

Step 4: The “Set Your New Password” page will popup. Enter your new password in the “Password” field and enter the same password again in the “Confirm Password” field.

Note:

  • A minimum of 5 characters is needed for password.

Figure 9: Change Password Page
Figure 9: Change Password Page

Step 5: Click on the”Submit” button to complete the password change.

2.1.4

View/Update User Profile

Below steps describe how you can view and update your user profile in the system.

Step 1: Login to the system with your id/password.

Step 2: At the Top Menu Bar, click on the “User” icon.

Figure 10: Top Menu Bar
Figure 10: Top Menu Bar

Step 3: The “My Profile” page will popup. Click on the “Update My Particulars” to update your profile.

Figure 11: My Profile Page (Update My Particulars)
Figure 11: My Profile Page (Update My Particulars)

Step 4: The “Update My Particulars” page will popup. You may change your particulars here.

Figure 12: Update My Particulars Page
Figure 12: Update My Particulars Page

Step 5: Click on the “Submit” button to update your profile.

Note:

  • Users are only allowed to update their names on the system.

  • Information such as email, contact number, identity number, designation and roles in the company can be updated by the Contractor administrators.

2.1.5

Forgot Password

In case of users forgetting their passwords, the system provides a self-service module for users to reset their own password without requiring the administrators to reset for them.

Step 1: At the login page, click on the “forgot password?” link.

Step 2: At the “Reset Password” page, enter the email address that you used to register for an user account in the system.

Note:

  • If you have forgotten your registered email address, you may use the “contact us” link to get the contact details of the PUB administrator to check.

Figure 13: Request for Reset Password Page
Figure 13: Request for Reset Password Page

Step 3: Click on the “Submit” button and the system will prompt you that a reset link has been sent to your email address.

Figure 14: Reset Password Message Prompt
Figure 14: Reset Password Message Prompt

Step 4: Check your email inbox for the “Password Recovery” email. Click on the “here” link in the email message.

Note:

  • You may have to check your spam/junk folder if you did not receive the email after 10 mins.

Step 5: At the “Reset Password” page, enter the new password in the “New Password” field. You must enter the same password again in the “Confirm New Password” field.

Figure 15: Reset Password Page
Figure 15: Reset Password Page

Note:

  • The system provides an indicator on your password strength. It is recommended that you provide a strong password for security concerns.

  • The system will automatically lock you out if you failed to login for three consecutive times within 30 mins.

Step 6: Click on the “SUBMIT” button to complete the password reset process.

2.1.6

Blacklisted

In the event where your Company has been blacklisted by PUB. All the users associated to the Company will not be able to login to the system.

Figure 16: Login Prompt for Blacklisted Company
Figure 16: Login Prompt for Blacklisted Company

You will have to contact PUB officers for the reason of the blacklist and for them to remove your company from the blacklist.

2.2

Contact Us

2.2.1

Contact Us

For any clarifications or help, you may access the “Contact Us” page for a list of personnel that you can contact. There are several ways to access the “Contact Us” page from the system, before or after login.

Step 1a: Before login (at the landing page or the login page), Click on the “contact us” link.

Figure 17: Contact Us Links (Before Login)
Figure 17: Contact Us Links (Before Login)

Step 1b: After login (at the Top Menu Bar), Click on the “Contact Us” menu.

Step 2: The “Contact Us” page will popup, displaying the personnel to contact.

Figure 18: Contact Us Page (Popup)
Figure 18: Contact Us Page (Popup)

Note:

  • The content in the “Contact Us” page may change over time as PUB administrators updates the contact details.

2.3

Contractor Company Profile

The system provides a contractor management module where each contractor (assigned Contractor Administrator) can add/edit/delete users in their own company.

2.3.1

Create Company Profile

Only companies under PUB’s existing list of “Registered CCTV Contractors” will be allocated a company user account and company profile. Please refer to www.pub.gov.sg for more details on registration of CCTV Contractors.

2.3.2

View Company Profile

Here are steps to view your company profile, as well as the users associated to the company.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “My Company” link.

Figure 19: Contractor Company Dashboard
Figure 19: Contractor Company Dashboard

Step 3: At the Company Profile page, you will see the Profile details and the users associated with your company.

Figure 20: Company Profile Page
Figure 20: Company Profile Page
2.4

List / Grid View

There is a common tool used across the system to list information in a grid. This section describes the functions and capabilities provided with this grid which can be used in the system whenever there is list/grid required.

Figure 21: Grid View (All Functions)
Figure 21: Grid View (All Functions)
2.4.1

Number of Entries in Grid

You can change the number of entries (results) to be listed per page. The default is 10 per page and the options are:

  • 10

  • 25

  • 50

  • 100

Figure 22: Show # of Entries in Grid
Figure 22: Show # of Entries in Grid
2.4.2

Pagination

Depending on the number of items that are listed in the grid (# of entries per page, or filter conditions), the grid will be paginated according to the maximum number of items per page accordingly.

Figure 23: Pagination (Navigation)
Figure 23: Pagination (Navigation)

You may use the following options/buttons to navigate through the pages in the grid:

  • Left Arrow: To navigate to previous page.

  • Right Arrow: To navigate to next page.

  • Page Number (First Page): The first number is always the first page. Click on it to jump to the first page.

  • Page Number (Last Page): The last number on the right is always the last page. Click on it to jump to the last page.

  • Page Number (In Between): Click on any of the page numbers in between to jump to those pages.

2.4.3

Filter Results

This section describes the functions to apply filters to the grid.

2.4.3.1

Universal Filter

Enter any text here to filter the results across all columns.

Figure 24: Universal Filter
Figure 24: Universal Filter

The grid (result) will react accordingly when you enter your filter text in the universal filter.

2.4.3.2

Column Filter

For more granular filtering, you may apply filters under each column. You can use the column filters in combination (different columns).

Figure 25: Column Filters
Figure 25: Column Filters

The grid (result) will react accordingly when you enter your filter in the column filters.

2.4.3.3

Clear Filters

You can reset the listing by clearing all the filters.

Figure 26: Clear Filters
Figure 26: Clear Filters
2.4.4

Sort Results

All results in the grid can be sorted by clicking on each column header. Change the sort order by clicking on the column header again.

Below are the icons to differentiate between ascending or descending sort order.

2.4.5

Export Grid to Excel

All the information in the grid can be exported to excel. The export will be based on all information listed in the grid (according to the filter conditions).

Figure 27: Export to Excel
Figure 27: Export to Excel

After filtering the information according to your needs, you may export the information to excel by clicking on the “Excel” button.

3.

CONTRACTOR ADMINISTRATOR FUNCTIONS

The system provides a contractor’s administrator module, for contractors to manage their respective contractor users in the company. During the registration of a new contractor company, a contractor administrator will also be created and assigned.

3.1

Manage Contractor Users

3.1.1

Add New User

Below are the steps to add a new user in a Contractor Company.

Step 1: Login to the system with your id/password (this user must have “Contractor Admin” role assigned).

Step 2: At the Contractor Company Dashboard, click on “My Company” link.

Figure 28: Contractor Company Dashboard
Figure 28: Contractor Company Dashboard

Step 3: At the Company Profile page, click on the “Add User” button.

Figure 29: Company Profile Page (Admin View)
Figure 29: Company Profile Page (Admin View)

Step 4: A new user profile form will popup. Enter the information in the fields.

  • Email: The email address that this new user will be using. This will also be the users’ id for logging into the system.

  • Name: The full name of the new user. This name will be auto-populated in the submission form when this user creates a new submission.

  • Designation: The designation (or title) this user has in your company.

  • Contact Number: The contact number of the new user. This contact number will be auto populated in the submission form when this user creates a new submission.

  • Identification Number: The identity number of the new user. This identity number will be auto populated in the submission form when this user creates a new submission. Role: The role(s) the new user will be assigned in the system (You may assign multiple roles for a user). Possible selections are:

    • Contractor Admin – With contractor administrator functions to manage users in the company.

    • Contractor User – With contractor user functions to view and create submissions made by the company.

Figure 30: New User Profile Form
Figure 30: New User Profile Form

Step 5: Click on the “Submit” button to create the new user in the system for your company.

Note:

  • There is currently a limit of three (3) contractor users per contractor company. This limit can be increased by the PUB administrators upon their review and approval.

  • A user, regardless of the role assigned, will be counted as one user. For example, a user with only “Contractor Admin” role assigned is still counted as one (1) user in the system.

3.1.2

Edit User

Below are the steps to edit an existing user in a Contractor Company.

Step 1: Login to the system with your id/password (this user must have “Contractor Admin” role assigned).

Step 2: At the Contractor Company Dashboard, click on “My Company” link.

Figure 31: Contractor Company Dashboard
Figure 31: Contractor Company Dashboard

Step 3: At the Company Profile page, click on the “Edit” icon of the desired/selected user to edit.

Figure 32: Company Profile Page (Admin View)
Figure 32: Company Profile Page (Admin View)

Step 4: The edit user profile form will popup. Amend the information in the fields

Figure 33: Edit User Profile Form
Figure 33: Edit User Profile Form

Step 5: Click on the “Submit” button to complete the save the changes.

Note:

  • To remove a role, click on the “x” icon beside the role icon in the textbox.

  • If you remove all roles from the user, the user will still be able to login to the system, but will not have access to view any submissions.

3.1.3

Delete User

Below are the steps to delete an existing user in a Contractor Company. Please note that this action is irreversible, you cannot undo this action.

Step 1: Login to the system with your id/password (this user must have “Contractor Admin” role assigned).

Step 2: At the Contractor Company Dashboard, click on “My Company” link.

Figure 34: Contractor Company Dashboard
Figure 34: Contractor Company Dashboard

Step 3: At the Company Profile page, click on the “Delete” icon of the desired/selected user to delete.

Figure 35: Company Profile Page (Admin View)
Figure 35: Company Profile Page (Admin View)

Step 4: You will be prompted to confirm if you want to delete the user.

Figure 36: Delete User Confirmation
Figure 36: Delete User Confirmation

Step 5: Click on “Yes” to confirm the delete. Click on “No” to discontinue the delete request.

Note:

  • By deleting the user, it will NOT delete the submissions that were previously submitted by this (deleted) user.

4.

CONTRACTOR USER FUNCTIONS

4.1

New Submissions

4.1.1

Create New Submissions

Below are the steps to create a new submission.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Create New Submission” link.

Step 3: Select the desired “Submission Type”.

Submission Type

Description

Pre-Con/Post-Con/Before DLP/End DLP

For CCTV video submissions associated with: pre-construction, post construction, post-repair, before DLP and end-DLP videos. You will be required to fill up the corenet submission number by the QP, when you select "Pre-Con" "Post-Con" or "Post-Repair" as the survey type.

Sewer Rehabilitation

For CCTV video submissions associated with sewer rehabilitation contracts.

NMB Term Contract

For CCTV video submissions associated with maintenance-related (NMB Term contract) videos.

For before DLP and end-DLP videos, select "Pre-Con/Post-Con/Before DLP/End DLP " instead.

Figure 37: Select Submission Type
Figure 37: Select Submission Type

Note:

  • The fields will be displayed in accordance to the submission type to capture the relevant information required for the respective submissions.

Step 4: Contractor Details (Auto-Populated)

Under the Contractors Details section, the “Company Name”, “Contact Person”, “Contact Number” and “Email” will be auto-populated based on the login user’s profile.

Note:

  • This information is not editable during new submission. You need to inform the Contractor Administrator to make this change. The updated information will be reflected in the submission.

Figure 38: Contractor Details
Figure 38: Contractor Details

Step 5: Add QP Details (for “Pre-Con/Post-Con/Before DLP/End DLP” submission)

Skip to Step 7 if you are not doing “Pre-Con/Post-Con/Before DLP/End DLP” submission.

Step 5.1: Company Name – The name of the QP company.

Step 5.2: Contact Person – The contact person’s (QP) name from the QP company.

Step 5.3: Contact Number – The contact number (of the QP) from the QP company.

Step 5.4: Email – The email (of the QP) from the QP company.

Figure 39: QP Details (Only for “Pre-Con/Post-Con/Before DLP/End DLP” submission type)
Figure 39: QP Details (Only for “Pre-Con/Post-Con/Before DLP/End DLP” submission type)

Step 6: Add Project Details (for “Pre-Con/Post-Con/Before DLP/End DLP” submission)

Skip to Step 7 if you are not doing “Pre-Con/Post-Con/Before DLP/End DLP” submission.

Figure 40: Project Details (Only for “Pre-Con/Post-Con/Before DLP/End DLP” submission type)
Figure 40: Project Details (Only for “Pre-Con/Post-Con/Before DLP/End DLP” submission type)

Step 6.1: Project Reference Number – The reference number given to the project (i.e. A1234 00123-2017).

Step 6.2: Project Title – The title of the project (i.e. Proposed erection of 2-storey apartment on LOT 300m MK01 40 Scotts)

Step 6.3: Location – The location of where the survey is conducted (i.e. 40 Scotts Road)

Step 6.4: Survey Type – The type of survey conducted (Options: Pre-Con, Post-Con, Post Repair, Before DLP, End DLP)

Step 6.5: QP Cover Letter – The cover letter provided by the QP for this submission. File format must be in pdf.

Note:

  • There is a slight difference in how the File Upload box is displayed on different browsers.

Figure 41: File Upload Boxes
Figure 41: File Upload Boxes

Step 6.5.1 Click on the “Browse”/”Choose File” button to select the file to upload.

Step 6.5.2: A Windows Dialog box will popup. Navigate to the file and click on the “Open” button to upload the file.

Figure 42: File Select Dialog Box
Figure 42: File Select Dialog Box

Step 6.6: SIP – The SIP document for this submission.

Step 6.6.1 Click on the “Browse”/”Choose File” button to select the file to upload.

Step 6.6.2: A Windows Dialog box will popup. Navigate to the file and click on the “Open” button to upload the file. File format must be pdf.

Refer to Figure 42: File Select Dialog Box for image reference.

Step 7: Add Contract Details (for “Sewer Rehabilitation” submission)

Skip to Step 8 if you are not doing “Sewer Rehabilitation” submission.

Figure 43: Contract Details (Only for "Sewer Rehabilitation" submission type)
Figure 43: Contract Details (Only for "Sewer Rehabilitation" submission type)

Step 7.1: Contract Reference – The reference number given to the contract (i.e. P5NR1).

Step 7.2: Contract Title – The title given for the contract.

Step 7.3: Contract Number – The contract number given (i.e. 45678)

Step 7.4: Location – The location of where the survey is conducted (i.e. 40 Scotts Road)

Step 7.5: Survey Type – The type of survey conducted (Options: Assessment of Sewer Conditions, Post-Rehabilitation Survey, Others)

Step 7.5.1: If you have selected “Others”, a textbox will appear for you to enter the type of survey (in free text).

Figure 44: Survey Type (Others)
Figure 44: Survey Type (Others)

Step 8: Add Work Details (for “NMB Term Contract” submission)

Skip to Step 9 if you are not doing “NMB Term Contract” submission.

Figure 45: Work Details (Only for "NMB Term Contract" submission type)
Figure 45: Work Details (Only for "NMB Term Contract" submission type)

Step 8.1: Work Order Number – The reference number given to the work order (i.e. 1234567).

Step 8.2: Contract Number – The contract number given for this work order (i.e. 456789).

Step 8.3: Location – The location of where the survey is conducted (i.e. 40 Scotts Road)

Step 8.4: Purpose of Work – The purpose of the work conducted (i.e. Ascertain structural condition of sewer pipe)

Step 9: Other Information (for “Pre-Con/Post-Con/Before DLP/End DLP” submission)

Skip to Step 10 if you are not doing “Pre-Con/Post-Con/Before DLP/End DLP” submission.

Figure 46: Other Information (“Pre-Con/Post-Con/Before DLP/End DLP”)
Figure 46: Other Information (“Pre-Con/Post-Con/Before DLP/End DLP”)

Step 9.1: Corenet Submission Number – The corenet submission number submitted by the QP. This is only applicable if you have selected the following survey types:

  • Pre-Con

  • Post-Con

  • Post-Repair

Step 9.2: Confirmation on QP/PE Assessment – Checkbox to confirm that the CCTV reports attached in the submission are assessed by the QP/PE.

  • Click on the checkbox (tick) to confirm.

  • Note: QP/PE will be informed about this submission via email.

Step 9.3: Remarks – Optional field to capture any additional remark for this submission. This remark will be viewable by PUB officers during their review/approval.

Step 10: Other Information (for "Sewer Rehabilitation" or “NMB Term Contract” submission)

Figure 47: Other Information ("Sewer Rehabilitation" or “NMB Term Contract”)
Figure 47: Other Information ("Sewer Rehabilitation" or “NMB Term Contract”)

Step 10.1: Remarks – Optional field to capture any additional remark for this submission. This remark will be viewable by PUB officers during their review/approval.

Step 11: Click on the “Next” button to proceed to the next step (page) of the submission (Add Sewer/Drainline Details)

Figure 48: Sewer/Drainline Details
Figure 48: Sewer/Drainline Details

Step 12: Click on the “+Add Sewer/Drainline” button to add a new sewer/drainline detail (Sewer/Drainline Detail Form will popup).

Skip to Step 13 if you are doing “Sewer Rehabilitation” submission.

Figure 49: Add Sewer/Drainline Details
Figure 49: Add Sewer/Drainline Details

Step 12.1: Sewer/Drainline G3FID – The id number of the sewer/drainline. This information will be used to validate the file names of the attached report, video and images.

Step 12.2: Date of Survey – The date of when the survey was conducted. This information will be used to validate the file names of the attached report, video and images.

  • Click on the “Calendar” button to select the date.

Step 12.3: Diameter (mm) – The diameter (in mm) of the sewer/drainline being surveyed.

Step 12.4: Rehabbed Diameter (mm) – The diameter (in mm) of the sewer/drainline after rehabilitation.

  • This is only applicable if the submission type is “Sewer Rehabilitation”.

Step 12.5: Entering Manhole ID #1 – The is number of the manhole that is used to enter the Sewer/Drainline being surveyed.

  • This is only applicable if the submission type is “Sewer Rehabilitation”.

Step 12.6: Entering Manhole ID #2 – The is number of the other (2nd) manhole that is used to enter the Sewer/Drainline being surveyed.

  • This is only applicable if the submission type is “Sewer Rehabilitation”.

Step 12.7: CCTV Operator Name – The name of the operator that recorded the CCTV.

Step 12.8: CCTV Certification ID – The certification ID of the operator that recorded the CCTV.

Step 12.9: CCTV Report – The CCTV Report (in pdf format). Click on the “Upload” button to select and upload the report.

This will be validated based on the sewer/drainline G3FID and Survey Date. Below are the allowed file names:

Sewer/Drainline G3FID

Date of Survey

Valid File Names [G3FID-MMDDYY-X], where X is Pre-Con, Post-Con, Pos

Invalid File Names

123ABC

12th July 2017

✔ 123abc-071217.pdf

✔ 123abc-071217 precon.pdf

✖ 456abc-071217.pdf

✖ 123abc -062017.pdf

✖ 123abc-071217.docx

Step 12.10: CCTV Video – The CCTV video (in mp4 format). Click on the “Upload” button to select and upload the video file.

This will be validated based on the sewer/drainline G3FID and Survey Date. Below are the allowed file names:

Sewer/Drainline G3FID

Date of Survey

Valid File Names [G3FID-MMDDYY-X], where X is Pre-Con, Post-Con, Post Repair, Before DLP or End DLP

Invalid File Names

123ABC

12th July 2017

✔ 123abc-071217.mp4

✔ 123abc-071217 beforeDLP.mp4

✖ 456abc-071217.mp4

✖ 123abc -062017.mp4

✖ 123abc-071217.avi

✖ 123abc-071217 sembawang.mpg

Step 12.11: Sewer/Drainline Condition Image – The image of the sewer condition (in jpg, png, gif, bmp format). Click on the “Upload” button to select and upload the image file.

This will be validated based on the sewer/drainline G3FID and Survey Date. Below are the allowed file names:

Sewer/Drainline G3FID

Date of Survey

Valid File Names [G3FID-MMDDYY-S],

Invalid File Names

123ABC

12th July 2017

✔ 123abc-071217-S.jpg

✔ 123abc-071217-S.gif

✔ 123abc-071217-S.bmp

✔ 123abc-071217-S.png

✖ 456abc-071217-S.jpg

✖ 123abc -062017-S.jpg

✖ 123abc-071217-S anywords.jpg

✖ 123abc-071217-S.tiff

Step 12.12: Click on the “Save” button to save the sewer/drainline record.

Upon successful saving, the new sewer/drainline record will be listed in the grid.

Figure 50: Sewer/Drainline Details (newly added)
Figure 50: Sewer/Drainline Details (newly added)

Note:

  • Click on the “Edit” button on the sewer/drainline grid to amend an added record.

  • Click on the “Delete” button on the sewer/drainline grid to remove an added record.

  • Repeat Step 12 (and sub-steps) to add another sewer/drainline detail.

Step 13: Click on the “Next” button to proceed to the next step (page) of the submission (Add Manhole Details)

Note:

  • Manhole detail is optional in all submission type.

Figure 51: Manhole Details
Figure 51: Manhole Details

Step 14: Click on the “+Add Manhole” button to add a new manhole detail (Manhole Detail Form will popup).

Figure 52: Add Manhole Details
Figure 52: Add Manhole Details

Step 14.1: Manhole ID – The id number of the manhole. This information will be used to validate the file names of the attached report, video and images.

Step 14.2: Date of Survey – The date of when the survey was conducted. This information will be used to validate the file names of the attached report, video and images.

  • Click on the “Calendar” button to select the date.

Step 14.3: CCTV Operator Name – The name of the operator that recorded the CCTV.

Step 14.4: CCTV Certification ID – The certification ID of the operator that recorded the CCTV.

Step 14.5: CCTV Report – The CCTV Report (in pdf format). Click on the “Upload” button to select and upload the report.

This will be validated based on the Manhole ID and Survey Date. Below are the allowed file names:

Manhole ID

Date of Survey

Valid File Names [G3FID-MMDDYY-X], where X is Pre-Con, Post-Con, Post Repair, Before DLP or End DLP

Invalid File Names

ID22334

20th June 2017

✔ Id22334-062017.pdf

✔ ID22334-062017 postrepair.pdf

✖ 456abc-062017.pdf

✖ ID22334-071217.pdf

✖ 123abc-071217.docx

Step 14.6: CCTV Video – The CCTV video (in mp4 format). Click on the “Upload” button to select and upload the video file.

This will be validated based on the Manhole ID and Survey Date. Below are the allowed file names:

Manhole ID

Date of Survey

Valid File Names [G3FID-MMDDYY-X], where X is Pre-Con, Post-Con, Post Repair, Before DLP or End DLP

Invalid File Names

ID22334

20th June 2017

✔ Id22334-062017.mp4

✔ ID22334-062017-post con.mp4

✖ 456abc-062017.mp4

✖ IId22334-071217.mp4

✖ Id22334-062017.avi

✖ Id22334-062017 sembawang.mpg

Step 14.7: Entrance Manhole Location – The image of the entrance of the manhole (in jpg, png, gif, bmp format). Click on the “Upload” button to select and upload the image file.

This will be validated based on the manhole G3FID and Survey Date. Below are the allowed file names:

Manhole ID

Date of Survey

Valid File Names [G3FID-MMDDYY]

Invalid File Names

ID22334

20th June 2017

✔ Id22334-062017.jpg

✔ Id22334-062017.gif

✔ Id22334-062017.bmp

✔ Id22334-062017.png

✖ 123abc-062017.jpg

✖ Id22334-071217.jpg

✖ Id22334-062017 anywords.jpg

✖ Id22334-062017.tiff

Step 14.8: Channel Inside Manhole – The image of the channel inside the manhole (in jpg, png, gif, bmp format). Click on the “Upload” button to select and upload the image file.

This will be validated based on the Manhole ID and Survey Date. Below are the allowed file names:

Manhole ID

Date of Survey

Valid File Names [G3FID-MMDDYY-Benching],

Invalid File Names

ID22334

20th June 2017

✔ Id22334-062017 benching.jpg

✔ Id22334-062017 Benching.gif

✔ Id22334-062017 benching.bmp

✔ Id22334-062017 BENCHING.png

✖ 123abc-062017 benching.jpg

✖ Id22334-071217 Benching.jpg

✖Id22334-062017 anywords.jpg

✖ Id22334-062017 Benching anywords.jpg

✖ Id22334-062017 Benching.tiff

Step 14.19: Click on the “Save” button to save the manhole record.

Upon successful saving, the new manhole record will be listed in the grid.

Figure 53: Manhole Details (newly added)
Figure 53: Manhole Details (newly added)

Note:

  • Click on the “Edit” button on the manhole grid to amend an added record.

  • Click on the “Delete” button on the manhole grid to remove an added record.

  • Repeat Step 14 (and sub-steps) to add another manhole detail.

Step 16: Click on the “Next” button to proceed to the next step (page) of the submission (Submission Summary)

The Submission Summary page provides the summary of all the information entered for the submission in one (1) single page.

Figure 54: Submission Summary Page (Part 1)
Figure 54: Submission Summary Page (Part 1)
Figure 55: Submission Summary Page (Part 2)
Figure 55: Submission Summary Page (Part 2)

Step 17: Optionally, you may click on the “Previous” button to go back to the previous steps to amend your information before submission.

Step 18: Click on the “Submit” button to submit the information to PUB for processing.

Step 19: You should be able to find the new submission created and is now pending review. (Refer to section 4.2 Search & View Submissions for steps to search and view submissions)

4.1.2

Draft Submissions

The system provides the function to automatically save newly created submissions as draft. If you have created new submission and has yet to submit, the submission can be found in the draft folder/list for future retrieval and submission.

4.1.3

Delete Draft Submissions

Draft submissions are not sent to PUB and they are only viewable by users in your company (PUB officers can’t see your draft submissions). You can remove the draft submissions with the following steps.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: Click on the “Draft” tab to view the list of draft submissions.

Step 4: Click on the “Delete” button to delete the desired draft submission.

Figure 56: Draft Submissions
Figure 56: Draft Submissions

Step 5: You will be prompted to confirm if you want to delete this draft submission.

Figure 57: Delete Draft Confirmation
Figure 57: Delete Draft Confirmation

Step 6: Click on “Yes” to confirm the deletion, click on “No” to cancel the delete action.

4.2

Search & View Submissions

The system applies filtering design for search functions. All the submissions are listed in a grid and can be filtered by statuses or any text (using the grid capabilities).

4.2.1

Search Submissions

To view submissions, you can either use the pre-defined tabs that filters submissions by statuses, or you may use the filtering functions at each tab/grid to search for the desired submission. Below are the steps.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: There are several tabs that were pre-defined for users to view submissions according to their status.

  • All – View submissions regardless of the submissions’ status.

  • Draft – View submissions that are in draft mode and yet to be submitted.

  • Pending Review – View submissions that were submitted and currently pending review by PUB officers.

  • Pending Approval – View submissions that were submitted and currently pending final review/approval by PUB officers.

  • Rejected – View submissions that were rejected by PUB officers.

  • Approved – View submissions that were approved/accepted by PUB officers.

  • Withdrawn – View submissions that were withdrawn by the Contractor.

Figure 58: View Submissions (Tabs)
Figure 58: View Submissions (Tabs)

Step 4: To further filter the list, you can use the Universal Filter or the Column Filters to find the desired submissions.

Figure 59: View Submissions (Filters)
Figure 59: View Submissions (Filters)
4.2.2

View Submissions

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: Optionally, you may apply filters in the desired Submission tabs to locate the desired submission.

Step 4: Click on the “View” button to view the submission.

Figure 60: View Submissions
Figure 60: View Submissions

Step 5: The submission will be displayed in view mode.

Figure 61: Submission Details (View Mode)
Figure 61: Submission Details (View Mode)
4.2.3

View Rejected Submission

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: Click on the “Rejected” tab to view the list of rejected submissions.

Step 4: Optionally, you may apply filters in the desired Submission tabs to locate the desired submission.

Step 5: Click on the “View” button to view the rejected submission.

Figure 62: View Submissions (Rejected)
Figure 62: View Submissions (Rejected)

Step 6: PUB officers make comments in each section/record when they reject the submission. You may view the comments by clicking on the “View Comments” button.

Figure 63: Sample of Rejected Submission with Comments
Figure 63: Sample of Rejected Submission with Comments

Step 7: The comments form will popup to display the reasons why the record is rejected.

Figure 64: Sample of Rejection Reason
Figure 64: Sample of Rejection Reason
4.3

Post Submission Actions

This section describes the activities / actions that can be performed after a submission is made (post submission). Post submission actions includes resubmitting a rejected submission (by PUB) and withdrawing a submission.

4.3.1

Resubmit Rejected Submissions

When a submission is rejected by PUB officers, you will be notified (via email) of the new status and you can view the reasons for the rejection in the submission online. To avoid having to re-entry all the information in the submission, the system provides a resubmission function, to allow Contractors to resubmit a CCTV submission with information that requires changes instead of the whole submission.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: Click on the “Rejected” tab to view the list of rejected submissions.

Step 4: Click on the “Resubmit” button of the desired submission to resubmit.

Figure 65: Resubmit Rejected Submission
Figure 65: Resubmit Rejected Submission

Step 5: You will be prompted to confirm if you want to create a resubmission.

Note:

  • The system only allows for one (1) resubmission for each submission version, once you have clicked on the “Resubmit” button, a draft (of the resubmission) will be created. In this case, you will no longer see the “Resubmit” button for this rejected submission in the rejected submission list.

    Figure 66: Resubmit Confirmation
    Figure 66: Resubmit Confirmation

Step 6: The rejection messages will be displayed in a red label at the submission forms’ main page. Click on the “Next” button to proceed to the subsequent sections for amendment.\

Figure 67: Resubmission - Rejection Messages
Figure 67: Resubmission - Rejection Messages

Step 7: Sections or Records that were marked as rejected by PUB officers, will be displayed with red fonts. You can edit/delete the fields/records to change the information accordingly to PUB officer’s rejection message.

Note:

  • Only sections or records marked as rejected (by PUB officers) are allowed for amendments by Contractor users. Sections or records marked as accepted (PUB officers) will be displayed in green and are no longer editable.

Step 8: Click on the “Edit” button to amend the record, or click on the “Delete” button to delete the record and add a new sewer/manhole record.

Figure 68: Example of Rejected Record (Sewer/Drainline)
Figure 68: Example of Rejected Record (Sewer/Drainline)
Figure 69: Example of Accepted Record (Manhole)
Figure 69: Example of Accepted Record (Manhole)

Step 9: Optionally, you may add a new Sewer/Drainline or Manhole record in the re-submission.

Step 10: At the Summary page, do a final review on the information updated.

Note:

  • The information you have updated for the rejected record will still be displayed in red.

Figure 70: Summary Page (Part 1)
Figure 70: Summary Page (Part 1)
Figure 71: Summary Page (Part 2)
Figure 71: Summary Page (Part 2)

Step 11: Click on the “Submit” button to complete with the re-submission.

4.3.2

Withdraw Submitted Submissions

To cater for wrong submission scenarios, the system provides a withdrawal function, for contractor users to withdraw a submission from the system. Withdrawal can be performed regardless of the status of the submission, even after the submission has been approved/accepted.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Step 3: Click on the “All” tab to view the list of rejected submissions. You may use other tabs as well.

Step 4: Click on the “Withdraw” button.

Figure 72: Withdraw a Submission
Figure 72: Withdraw a Submission

Step 5: You will be prompted to confirm if you want to withdraw the submission.

Note:

  • Withdrawal is NOT reversible, you cannot undo a withdrawal after the confirmation.

  • You cannot perform re-submission from a withdrawn submission. You have to create a new submission.

Step 6: Click on “Yes” button to confirm the withdrawal. Click on “No” to cancel the withdrawal action.

Step 7: All withdrawn submissions can be viewed in the “Withdrawn” tab.

Figure 73: Withdrawn Submission List
Figure 73: Withdrawn Submission List
4.4

Export Submission List

4.4.1

Export to Excel

The system provides the function for users to export the results in the grid/list to excel for their own reporting or archival purpose.

Step 1: Login to the system with your id/password.

Step 2: At the Contractor Company Dashboard, click on “Submissions” link.

Figure 74: Contractor Company Dashboard
Figure 74: Contractor Company Dashboard

Step 3: Click on any of the tabs to filter the submission listing based on the submissions’ statuses.

✔ All

✔ Draft

✔ Pending Review

✔ Pending Approval

✔ Rejected

✔ Approved

✔ Withdrawn

Figure 75: Submission List
Figure 75: Submission List

Step 4: Optionally, you may apply more filters in the grid to filter the grid to list the information according to your needs.

Step 5: Click on the “Excel” button to export the result (on the grid) to excel.

Figure 76: Submission List (Filtered, Export)
Figure 76: Submission List (Filtered, Export)

Step 6: Depending on the browser that you used, the download experience might differ slightly.

  • Chrome: File is downloaded automatically (i.e. download folder) and you can click on the link at the bottom of the browser to view the file.

  • Internet Explorer: Prompts you to open or save the downloaded file.

Figure 77: Downloaded Files (Different Browsers)
Figure 77: Downloaded Files (Different Browsers)
5.

EMAIL NOTIFICATIONS

This section will list the various email notifications that you may receive from the system.

5.1

Password (User Account) Notification

5.1.1

Password Issuance Notification

When a new contractor user is created by the Contractor Administrator, this password issuance notification will be sent to the newly created contractor user. This email will contain a link to set a new password to access the system.

Figure 78: Email Notification - Account Creation
Figure 78: Email Notification - Account Creation
5.1.2

Password Recovery Email

When a user forgets his/her password to the system, they may initiate a password reset (refer to 2.1.5 Forgot Password). This password recovery will be sent to the requestor’s registered email, it will contain a link to reset the password for this user account in the system.

Figure 79: Email Notification - Password Recovery
Figure 79: Email Notification - Password Recovery
5.2

Submission Notifications

5.2.1

Submission Confirmation

Upon successful submission to the system, a confirmation email will be sent to the contractor user. The confirmation email will contain the main details of the submission

Figure 80: Email Notification - Submission Confirmation
Figure 80: Email Notification - Submission Confirmation

Note:

  • This email will be sent for new submissions and resubmissions are received in the system.

5.2.2

Submission Acceptance

When a submission is reviewed and accepted by PUB officers, this submission acceptance notification will be sent to the contractor users. In this notification, the submitted reports (pdf) and images will be attached for reference.

Note:

  • If this is a “Pre-Con/Post-Con/Before DLP/End DLP” where QP details were provided, the QP will also receive this notification via email.

Figure 81: Email Notification - Submission Acceptance
Figure 81: Email Notification - Submission Acceptance
5.2.3

Submission Rejection

When a submission is reviewed and rejected by PUB officers, this submission rejection notification will be sent to the contractor users.

Note:

  • If this is a “Pre-Con/Post-Con/Before DLP/End DLP” where QP details were provided, the QP will also receive this notification via email.

  • PUB officers may choose to accept a portion of the submission and reject the remaining portion. In this case, the notification will mention that this is a partial rejection.

Figure 82: Email Notification - Submission Rejection
Figure 82: Email Notification - Submission Rejection