The Contractor shall implement effective Earth Control Measures (ECM) during construction stage at all times. The ECM shall be implemented according to the Code of Practice on Surface Water Drainage. [Important Note: The contractor shall note that ECM are meant for the containment and treatment of silty rainwater runoff only, and not meant for the treatment of process water from construction activities such as slurry from tunnelling, pipe-jacking and bore-piling works. Such process water should be handled and treated to comply with the requirements under Environmental Protection and Management Act (Chapter 94A).]