Details of the revised fees structure applicable for all projects whose first set of plans is submitted to BCA for approval on or after 10 September 2017 are tabulated below:
(a) General building / Specified building
General building (SGFA)/ Specified building (Area of plan view) | Revised Rate |
(New) Below sublevel Refers to any storey that is more than 6 metres below the finished floor level of the 1st storey | (New)$400for every 100m2(or part thereof) in this location |
Above sublevel Refers to the 1st storey and above Refers to any storey that is 6 metres below or less than 6 metres below the finished floor level of the 1st storey
| $300 for every 100m2(or part thereof) for the first 2,500m2(Unchanged) $240for every subsequent 100m2or part thereof(Revised)
|
*General building / Specified building, sublevel – please refer to the new Second Schedule of the Building Control Regulations.
(b) Addition and alteration (A&A) works without increase in SGFA
A&A works without increase in SGFA | Rate |
Without structural plan submission | $200 per storey |
With structural plan submission | For residential building: $200 per storey |
For non-residential building: $400 per storey |
(c) Addition and alteration works with increase in SGFA
A&A works with increase in SGFA | Rate |
a) Where structural plan submission is not required |
For the 1st2500m2of SGFA | $240 per storey + $300 per 100m2or part thereof |
For the subsequent SGFA | $240 per 100m2or part thereof |
b) Where structural plan submission is required |
For the 1st2500m2of SGFA | For residential building: $200 per storey + $300 per 100m2or part thereof
For non-residential building: $400 per storey + $300 per 100m2or part thereof |
For the subsequent SGFA | $240 per 100m2or part thereof |
(d) Departures from and deviations to approved plan of buildings
Works with deviations to approved plan | Rate |
Deviation from approved plan of building works | $200 per storey |
For the 1st2500m2of new floor area | $300 per 100m2or part thereof |
For the subsequent new floor area | $240 per 100m2or part thereof |
(e) Demolition of entire building
Demolition of entire building | Rate |
General building | $200 per storey |
Specified building | $200 for every 5 metres or part thereof, of the building |