Introduction

Place of Worship developments are zoned PW (Place of Worship) in the Master Plan. These sites are approved specifically for worshipping and they may include purpose-built mosques, churches and temples. All PWs are required to adhere to the development guidelines on the allowable Gross Plot Ratio (GPR), use quantum, ancillary uses, number of storeys, site coverage, building setback from road and common boundary. Designs for PW developments should be sensitive to the surrounding developments and minimise potential disamenities by locating uses and activities that may cause nuisance away from adjacent developments (e.g. nearby residents).

Gross Plot Ratio

The guideline on the allowable Gross Plot Ratio (GPR) for new PWs varies depending on the location and the context of the surrounding area. The allowable GPR in the table below is the upper bound. The actual allowable GPR would depend on the site conditions, traffic situation, impact of the PW on the nearby developments and other agencies’ requirements.

Allowable Gross Plot Ratio

Location

Gross Plot Ratio Control

Within landed and low-density housing areas with GPR less than or equal to 1.4

Up to 1.0

At the fringe of landed and low-density housing areas with GPR less than or equal to 1.4

Up to 1.4

Within HDB estates and in areas with GPR more than 1.4

Up to 1.6

Within or at the fringe of industrial estates

Up to 1.6

Within Central Area and within other commercial centres, including party-wall developments such as in Geylang area

Subject to evaluation and localised urban design guidelines.

The area of the land required to be set aside for drainage reserve1 (DR) and/or road reserve2 (RR) to be vested in the State may be included in the site area to compute the gross floor area (GFA) for a GPR – see figure below.

1 Drainage Reserve (DR): An area safeguarded for purposes of building or widening a public drain

2 Road Reserve: The plot of land to be vested in the State as required under the Street Works Act. It is demarcated by the line of Road Reserve in the Road Line Plan and the site boundary.

GPR for sites where vesting is required
GPR for sites where vesting is required

For redevelopment of existing approved PW developments or to carry out major extensions to them, the proposed increase in GPR or Gross Floor Area (GFA) is subject to planning consideration taking into account the location of the PW, context of the surrounding area and requirements of other government agencies such as LTA. Planning approval from URA shall be obtained first before commencement of works.

Building Height

Building Height
Building Height

Overall Building Height

Unless otherwise stated, the overall building height1 of PW developments is subject to compliance with the technical height controls of the relevant agencies such as Civil Aviation Authority of Singapore (CAAS) and the Defence Science and Technology Agency (DSTA). 

1 Building height is based on Singapore Height Datum (SHD). 

Storey Height

The allowable number of storeys for the PW shall take into account the character of the surrounding area. As a guide, depending on the allowable GPR, the corresponding number of storeys are shown in the table below. The actual number of storeys allowed may vary, depending on the site topography, site condition and the context of the surrounding area.

Allowable Storey Height

Location

Storey Height Control

Within landed and low-density housing areas with GPR less than or equal to 1.4

Up to 2 or 3 storeys based on the storey-height control of the landed housing estate

At the fringe of landed and low-density housing areas with GPR less than or equal to 1.4

Up to 4 storeys

Within HDB estates and in areas with residential GPR more than 1.4

For PWs of GPR less than or equal to 1.4, up to 4 storeys

For PWs of GPR more than 1.4 and less than or equal to 1.6, up to 5 storeys within a 25m envelope control that includes the attic. An additional height allowance of up to 5m may be granted if purpose-built above-ground car park floors are provided. The additional height allowance shall be designed sensitively and shall be subject to detailed evaluation.

Within or at the fringe of industrial estates

For PWs of GPR less than or equal to 1.4, up to 4 storeys

For PWs of GPR more than 1.4 and less than or equal to 1.6, up to 5 storeys within a 25m envelope control that includes the attic. An additional height allowance of up to 5m may be granted if purpose-built above-ground car park floors are provided. The additional height allowance shall be designed sensitively and shall be subject to detailed evaluation.

Within Central Area and within other commercial centres, including party-wall developments such as in Geylang area

Subject to evaluation and localised urban design guidelines.

Floor-to-Floor Height

The maximum floor-to-floor height of PW developments is 5.0m.

Religious Symbols

Height of religious symbols
Height of religious symbols

Religious symbols like crosses, minarets or statues shall not be overly large such that they become a dominant feature of the PW. It shall be kept no taller than the allowable number of storeys. If it is mounted on the roof, it shall not be higher than 5.0m from the roof level.

RC Flat Roofs

RC flat roofs shall remain inaccessible except for maintenance purposes only1. Activating the rooftop for uses such as roof terraces and landscaped gardens may be allowed depending on the merits of the proposal. No structures shall be allowed unless otherwise approved by URA. Where allowed, structures (including any safety barriers) shall comply with height controls2 and the following guidelines.

1 RC flat roofs that are accessible via ladders for maintenance purposes only are subject to agencies’ requirements for safety barriers to ensure the safety of maintenance personnel. Safety barriers shall not exceed 1m in height.

2 Height controls applicable, include:

  • Absolute technical height constraints@ (e.g. Aviation paths restrictions, military and telecommunications installations).

  • Conservation guidelines (available at URA SPACE)

  • Urban design height controls (available at URA SPACE)

@ The absolute technical height (Based on Singapore Height Datum [SHD]) shall take precedence if it is stricter than any of the other height controls.

Communal Pavilions

Rooftop pavilions are not allowed in PW developments to minimise dis-amenity to neighbouring developments.

Solar Panels

The installation of solar panels on RC flat roofs may be considered if they meet the following criteria:

  1. Solar panels are installed between 10 to 15 degrees relative to the horizontal plane to optimise the performance of solar panels and minimise glare to the buildings in the vicinity; and

  2. The installation of solar panels shall not result in the removal of any greenery approved under the Landscaping for Urban Spaces and High-Rises (LUSH) Programme.

Installation of solar panels and M&E equipment such as inverters for the solar panel system does not require planning permission except in locations and contexts described below.

Planning Permission

  1. Areas subject to urban design guidelines and Conservation Areas1 shall require planning permission due to their impact on the roofscape.

    1 For Conservation Areas, installation of solar panels without any additional works are treated as localised works for the purpose of repair and maintenance and are considered Category 3 works for Conserved Buildings. Applications for such Category 3 works can be made by owners and contractors. Refer to the Conservation Guidelines here and information on submission procedure here.

  1. Elevated solar panels2 located in developments on the following land use zones shall require planning permission:

  • Residential (landed housing, flats and condominium housing developments)

  • Residential with Commercial at 1st Storey

  • Mixed Commercial & Residential

  • Commercial

  • Hotel

  • White

  • Residential / Institution

  • Commercial / Institution

  • Educational Institution

  • Place of Worship

  • Civic & Community Institution

2 A solar panel is deemed to be elevated if it is raised more than 1m from the roof level for landed housing developments or 1.8m from the roof level for other developments.

  1. Spaces under solar panels are enclosed or put to commercial use
    Planning permission shall be required if the spaces under elevated or non-elevated solar panels are enclosed or put to commercial uses such as Outdoor Refreshment Areas. In such instances, the spaces shall be computed as GFA.

Assessment of Storey Height

Elevated solar panels that require planning permission may be assessed as an additional storey for storey height control purposes unless they comply with the guidelines below:

Guidelines for Elevated Solar Panels

Parameter

Guidelines

Extent

Within the 45-degree line from the springing line of the roof level

Height

Maximum 5m above roof level

Extent and Height of Elevated Solar Panels
Extent and Height of Elevated Solar Panels

Building Setback from Boundary

Setback Requirements
Setback Requirements

All PWs shall be sufficiently set back from the road and common boundary. The setback distance is measured from the road reserve1 line or boundary line to the external wall of the buildings, excluding land to be vested to the State for road or drainage or public purpose.

All PWs fronting a public road shall provide a road buffer, the width of which depends on the hierarchy of the road. A green buffer shall be set aside in the road buffer depending on the width of the road buffer.

The buffer requirements for the Road Categories 1 to 5 are in Table 1 below. The common boundary setback requirements are in Table 2 below. Different setback requirements may apply for sites within the Geylang area or the Central Area, both of which are guided by Urban Design guidelines.

1 Road Reserve: The plot of land to be vested in the State as required under the Street Works Act. It is demarcated by the line of Road Reserve in the Road Line Plan and the site boundary.

Table 1: Road Buffer, Green Buffer

Road Category

Road Buffer
(inclusive of Green Buffer indicated in brackets)

Category 1

15m
(5m)

Category 2

7.5m
(3m)

Category 3

5m
(3m)

 Category 4 - 5 and slip road

5m
(3m)

Table 2: Common Boundary Setback & Planting Strip

Type of Boundary

Building Setback Requirement

Common boundary with other developments

Minimum 4.5m
(including 2m planting strip)

Common boundary with an industrial development

No setback (see note below) is required at the common boundary between an industrial development and a Place of Worship (PW) development subject to the following conditions:

  • The sites are located well within the industrial estate and not next to non-industrial developments;

  • No openings along common boundary; and

  • No adverse impact on the surrounding developments

Note: Where the building is proposed to abut the common boundary, the applicant should put in place systems/measures to facilitate down-stream building maintenance at the common boundary.

Table 3: Setback for Building Appendages

Building Feature

Within Road Buffer

Within Setback from Common Boundaries

Roof eaves

Allowed, provided it is not within the green buffer

Allowed, provided it is not within the 2.0m planting strip

Sun-shading devices & RC ledges (cantilevered)

Basements

A basement storey refers to a storey of a building which may be partially or wholly below the existing ground level. In so far as storey height control is concerned, basement storeys that protrude more than 1.0m above ground level on any side shall be counted as a storey.

Basement Setback and Vertical Openings
Basement Setback and Vertical Openings

The physical limit for which the basement may be built up to is shown in the table below.

Basement Setback

Type of Basement

Setback from Road Reserve Line

Setback from Other Boundaries

Basement with protrusion

Up to the road buffer

Up to the building setback

Sunken basement

Up to the road reserve1 line, provided the portion underneath the green buffer is submerged at least 2m or more below the ground level

Up to the site lot boundary, provided:

  • the portion underneath the 2m tree planting strip is submerged at least 2m or more below the ground level;

  • there are no technical requirements (eg sewerage, drainage) and the basement does not cause any adverse impact to the adjoining property;

  • the side of a basement wall abutting any site boundary shall not have any openings into the adjoining site.

1 Road Reserve: The plot of land to be vested in the State as required under the Street Works Act. It is demarcated by the line of Road Reserve in the Road Line Plan and the site boundary.

Basements with vertical openings on the side walls may be allowed only if they are required for natural ventilation and to meet the building regulations. The guidelines are as follows:

  • While the protrusion measured from the level at the site boundary shall not exceed 1.0m, basements may be exposed up to 2.0 m from the point where the platform level meets the basement wall (ie the earth around the basement wall may be cut to slope down to achieve the 2.0m basement exposure with openings).

  • The extent of the slope within the green buffer or planting strip shall have a gradient of 1:2.5.

  • Vertical cutting of the earth resulting in a trench around the basement is not allowed.

  • The extent of the vertical openings or the types of cover over the vertical openings shall be subject to the requirements of the other technical departments.

  • Horizontal openings to the basement are allowed within the setback distance outside the green buffer and planting strip, subject to provision of effective screening to hide the view to the basement.

Basement Horizontal Openings
Basement Horizontal Openings

Special and Detailed Control Plans

Special and Detailed Control Plans (SDCP) provide detailed guidelines for specific areas. The SDCPs may be viewed here.

Special Control Areas

The following areas may be subject to security screening requirements. URA will confirm this upon submission of a proposed development.

Special Control Area 1
Special Control Area 1
Special Control Area 2
Special Control Area 2

Qualified Persons (QPs) should consider the screening requirements in the early stage of their planning and design to avoid abortive work subsequently.

Where security screening is deemed necessary, it shall consist of permanent fixtures that are difficult, if not impossible to remove. The following screening measures may be considered:

Visual Screening

Residential units and common areas may be screened where necessary with blank walls, external concrete/metal fins, or the building may be re-orientated such that the windows1/openings/balconies do not have direct view towards the protected area.

1 Window: Raised openings that are at least 0.9m above the floor slab. They are intended to provide ventilation and lighting, and not for access. Full height windows and windows that are lower than 0.9m that can potentially be used as access points will need to be highlighted in the submission plans for URA’s evaluation and approval.

Roof Screening

The parapet wall at the rooftop shall be at least 3m high and access to the rooftop from a public area shall be secured by a lockable door/hatch. The door/hatch may be electronically linked to an alarm system monitored by the building management.

Street Block Plans

Street block plans guide the detailed setback, storey height and building height, for the following locations. Click on the reference links to view the detailed street block plan.

Street Block

Balestier Road Between Thomson Road and Moulmein Road

Geylang Road, Sims Avenue, & Guillemard Road, bounded by Sims Way and Paya Lebar Road

Mount Sophia Conservation Area

Race Course Road / Birch Road / Serangoon Road / Chander Road

Yan Kit Road

Developments Involving Waterbodies

To maintain the integrity and aesthetics of the waterfront areas so that the public can have free and unrestricted access to enjoy these spaces, developments at major waterbodies1 shall observe the design and development application submission guidelines below.

1 Major waterbodies: rivers, canals of at least 17.5m width, reservoirs, and seas.

Developments at Major Waterbodies
Developments at Major Waterbodies

Design Guidelines

  1. Retaining Walls

    Retaining walls along the waterbodies may be allowed subject to the following criteria:

    1. Retaining walls are less than 1.5m in height;

    2. Retaining walls are set back at least 300mm from the boundary;

    3. Retaining walls are covered with creepers.

  1. Boundary Walls/Fences

    For non-industrial developments, proposed boundary fences shall be porous (eg chained-link, metal-grille, or timber fence).

    For industrial developments, the following may be allowed:

    1. Solid boundary walls not exceeding 1.8m in height. The walls shall be aesthetically treated.

    2. Chain-linked fences not exceeding 1.8m in height with close planting of shrubs/vegetation as screenings. A planting strip of 0.5m width (minimum) shall be provided within the development.

  1. Slope

    There shall be no abrupt change in slope gradient at the boundary between the development and the waterbody. The slope gradient shall not exceed 1:2.

  1. Conservation of Vegetation

    Mature vegetation along the waterbodies are to be saved and conserved, wherever possible.

Development Application Submission Guidelines

In all waterbodies-related development application submissions to URA, the following shall be provided, where applicable:

  • Site/Location Plan showing the width and alignment of Drainage Reserve2/Waterbody/Coastal Profile;

  • Layout plans and cross-sections showing the area between the site and the Drainage Reserve/Waterbody/Coastal Area including existing and proposed ground levels;

  • Design details of integration with waterbody including slope, retaining wall, and boundary wall/fencing (Height, Type, Screening);

  • Contour lines extending to 1m beyond the side of development fronting the Drainage Reserve/Waterbody/Sea;

  • Checklist for Waterbodies-related proposals.

2 Drainage Reserve (DR): An area safeguarded for purposes of building or widening a public drain

Application of Guidelines

The design guidelines listed above shall apply to all developments adjacent to or with waterbodies except developments adjacent to or with Drainage Reserves less than 17.5m.

All proposals involving waterbodies shall comply with the development application submission guidelines listed above.

Additional Guidelines for Use of Foreshore by Developments with a Frontage to the Sea

For land use planning and development control purposes, the foreshore3 and the area within 15m on both the landward and seaward side of the foreshore line4 shall be kept free of structures. Some structures such as ramps may be permitted if they are constructed in connection with an approved development (eg marine industries, refineries, and pleasure-boat storage complex). These structures are subject to planning evaluation depending on merits.

3 The area between the high water mark of the Spring Tide or the top of the seawall and the low water mark of the Spring Tide.

Foreshore A, B
Foreshore A, B

4 The high water mark of the Spring Tide; the top of the existing seawall or revertment or river wall (where appropriate) for controlling landward development.

Foreshore C
Foreshore C

Ancillary Structures

Setback Requirements for Ancillary Structures
Setback Requirements for Ancillary Structures

Ancillary structures are minor structures erected to support the main use of the site. The building setback distance and height control for ancillary structures are shown in the table below.

Ancillary structures located within the green buffer may be assessed in accordance with NPARKS' guidelines – see here.

Ancillary structures located within the physical buffer and building setback that exceed the requirements in the table below, but are below 6m in height, shall be evaluated depending on the merits of the design and function.

Setback and Height Control for Ancillary Structures

Type of Ancillary Structures

Required Setback from the Road

Required Setback from the Other Boundaries

Height Control

Electrical Substation

5m from Category 1 road

3m from Category 2 – 5 roads

2m

6m

Sunken Swimming Pool

Not applicable

Raised Swimming Pool

Follow road buffer standards

Water Tank & Pump

Meter Compartment

Subject to evaluation

1.8m if located within the green buffer

Bin Point

Guardhouse

2.6m if located within the green buffer

Generator Set

Subject to evaluation
Adequate setback may have to be provided to minimise glare and noise disturbance to adjoining developments

Tennis Court

Parking

LTA prescribes the parking provision standards and requirements for motor vehicles and bicycles. The requirements are usually based on the quantum of the gross floor area or the number of units of the development uses.

Separately, to enhance commuter experience and reduce congestion at Pick-up and Drop-off Points (PUDOs), LTA and URA collaborated with the industry to develop a design guide for PUDOs containing best practices that building owners and professionals can consider applying to new and existing PUDOs.

Car and Motor-Cycle Parking

Under LTA’s Range-based Parking Provision Standards (RPPS), developments are subject to car and motor-cycle1 parking provision requirements.

Unless explicitly approved as private parking lots in the approved plans, all car and motor-cycle parking lots shall be treated as common property.

1 Motor-cycle parking provision is mandatory in all non-residential developments.

Range-based Parking Provision Standards (RPPS)

The RPPS allows developments to provide any level of car and motor-cycle parking provision within a specified range, defined by a lower bound and an upper bound – see figure below. The range varies according to location zones and land uses. Details may be found in LTA’s Code of Practice for Vehicle Parking Provision in Developments.

Range-based Parking Provision Standards
Range-based Parking Provision Standards

New PW developments shall be subject to a process of waiver evaluation by LTA, if one wishes to provide surplus car and motor-cycle parking lots, ie parking provision above the upper bound based on the new RPPS.

Bicycle Parking

To promote a car-lite society, PW developments may be required to provide bicycle parking facilities within the developments. Refer to LTA’s Code of Practice for Vehicle Parking Provision in Developments here for the list of requirements.

Unless explicitly approved as private parking lots in the approved plans, all bicycle parking lots shall be treated as common property.

Bicycle parking lots provided according to LTA’s new standards are exempted from GFA computation. Surplus provision of bicycle parking lots may be exempted from GFA computation depending on merits and context of the development.

Use Quantum & Allowable Uses

Minimally, 50% of the total proposed GFA shall be used for praying area only. The remaining 50% GFA may be used for ancillary activities, up to 10% of which may only be used for non-religious ancillary activities like meeting/conference room, library, computer room, childcare centre or kindergarten. Independent offices and shops shall not be allowed. Refer to Tables 1 and 2 below for the use quantum control, and a list of allowable ancillary uses within PWs.

Table 1: Use Quantum Control

Predominant

Ancillary

Minimum 50%

Maximum 50%

-

Ancillary Non-Religious

Ancillary Religious

Columbarium

-

Maximum 10% of total GFA

Remaining GFA

Maximum 20% of total GFA

Table 2: Allowable Ancillary Uses

Ancillary Non-Religious

Ancillary Religious

Childcare Centre (CCC)

  • Up to 500sqm
    Note: CCCs larger than 300sqm will require ECDA’s endorsement.

Religious Classrooms

Kindergarten

  • Up to 300sqm only

Priest/Caretakers’ Rooms

Conference Room

Library

Meeting Rooms

 

Ancillary Columbarium

Ancillary columbaria use may be allowed within PWs subject to planning consideration taking into account the location of the PW, site constraints and its impact on the surrounding area, traffic conditions, and requirements of other government agencies. An ancillary columbarium in a PW shall adhere to the following requirements.

Location

  • Proposed ancillary columbaria shall be located inside the main PW building and shall not be stand-alone structures. Proposed new building extensions for columbarium use shall abut the main building and be fully integrated with it.

  • For standalone or independent PW developments, basement columbaria are preferred, but above-ground columbaria may be considered subject to complete screening from public view.

  • For party-wall PW developments, the columbarium shall be sited in the basement.

Allowable Types of Ancillary Columbarium

Allowable ancillary columbarium
Allowable ancillary columbarium

Types of Ancillary Columbarium that cannot be allowed

Ancillary columbarium that cannot be allowed
Ancillary columbarium that cannot be allowed

Quantum

  • Proposed ancillary columbaria are allowed up to 20% of the total building GFA.

  • Up to 40% of total building GFA may be allowed for ancillary columbaria if the PW development:

    1. is located at the fringe of industrial estates; and

    2. is not facing or near residential areas.

Walking and Cycling Plan (WCP)

Submission of WCP

PW developments with expected high pedestrian and cyclist traffic are required to provide a WCP as part of the Development Application. As a guide, development types listed in the table below are subject to WCP requirement.

Development Types that require WCP as part of TIA1

Development Type

Scale

  1. Residential

    1.1 Landed properties/ Condominiums/Executive Condominiums
    1.2 HDB housing2


1.1 ≥ 700 units
1.2 ≥ 1,000 units

  1. Commercial

    2.1 Shopping centres/ Retail uses
    2.2 Office development
    2.3 Hotel


2.1 ≥ 10,000sqm GFA
2.2 ≥ 20,000sqm GFA
2.3 ≥ 700 rooms

  1. Industrial

    3.1 Light/General Industry3
    3.2 Warehousing/Distribution3
    3.3 Science park/High tech park/Business park


3.1 ≥ 60,000sqm GFA
3.2 ≥ 50,000sqm GFA
3.3 ≥ 40,000sqm GFA

  1. Educational

    4.1 Primary school
    4.2 Secondary school
    4.3 International school
    4.4 Junior college
    4.5 University, polytechnic, ITE campus


4.1 ≥ 1,500 students (single-session) or ≥ 2,000 students (double-session)
4.2 ≥ 2,000 students
4.3 ≥ 2,000 students
4.4 ≥ 2,000 students
4.5 TIA Required

  1. Medical

    Hospital


≥ 40,000sqm GFA or ≥ 320 Beds (whichever is triggered first)

  1. Recreational

    Exhibition centre & major tourist attraction


≥ 30,000sqm GFA

While PW developments are not listed in the table above, they may also be required to submit a WCP if they fall under the following criteria:

  • Developments located in car-lite precincts4; or

  • Developments located within 400m of major transport nodes, ie within Zone 25; or

  • Retail, Office, Mixed Use developments.

Applicants of developments meeting the above criteria are strongly encouraged to check in early with LTA for the requirement of a WCP. See the diagram below for the submission flowchart to LTA and URA.

Submission Flowchart
Submission Flowchart

1 Developments that have a master developer, and consist of two or more plots that staged at different time will also be required to submit a WCP at the concept design stage.

2 LTA and URA will work with HDB on the WCP requirements.

3 Only industrial developments located within car-lite precincts or 400m of major transport nodes ie within Zone 2, will be required to submit a WCP.

4 The five car-lite precincts are Bayshore, Jurong Lake District, Kampong Bugis, Marina South and Woodlands North.

5 Zone 2 as defined in the Zonal Car Parking requirement in the Code of Practice on Vehicle Parking Provision in Development proposals. Please refer to LTA's website for more details.

Design of WCP

The WCP shall consider the safety, convenience, and accessibility of pedestrians and cyclists, and incorporate the following elements in the design of the development:

  • Provision of convenient and direct access from nearby public transport facilities and adjacent developments;

  • Provision of measures to minimise conflicts between pedestrians, cyclists and motor vehicles at locations such as the vehicular ingress/egress, car park entrances, and drop-off points;

  • Provision of sufficient and conveniently located bicycle parking spaces and supporting amenities such as shower facilities and lockers;

  • Provision of way-finding signage to public transport facilities and amenities for cyclists; and

  • Provision of barrier-free access and routes for children, elderly and the mobility challenged groups.

The detailed guidelines on WCP and submission requirements are summarised in LTA’s Code of Practice “Street Work Proposals Relating to Development Works”.

To provide assistance on developing active mobility-related infrastructure in a holistic manner, a Walking & Cycling Design Guide has been produced as a supplement to the respective agencies’ prevailing COPs, engineering and development standards. The Guide can be downloaded here.

Earthworks, Retaining Walls, and Boundary Walls

Earthworks

Earthworks are defined as any operations or works in, on, or over land which result in substantial modification to the existing ground terrain, land form, or slope. These include excavation, formation of a new slope or embankment, and cut and fill operations.

Extensive earthworks are discouraged as it may change the existing terrain. Earthworks may also result in the building of high retaining walls that mar the streetscape and have adverse impacts on the surrounding areas. Earthworks on any development site, where necessary, shall be minimised.

Planning permission is required if earthworks involve more than 2,000sqm of land or change in the level of the land of more than 1.5m anywhere in the development site or relative to the neighbouring land.

The guidelines for earthworks are dependent on where the earthworks are carried out.

Location of Allowable Earthworks
Location of Allowable Earthworks

Earthworks within the building setback area

Earthworks may not be allowed within the building setback area, except in the following circumstances:

  • When the proposed earthworks are to match the existing platform levels of the neighbouring sites;

  • When the sites are on undulating or sloping terrain, with large differences in platform levels within the site, or between the site and the road;

  • When the earthcut is necessary to build a fully submerged basement. The area within the building setback shall be reinstated to the original platform level upon the completion of the basement.

Earthworks within the build-able area (ie outside the building setback area)

Earthworks within the build-able area of more than 1m are subject to evaluation depending on merits. If the earthfill of more than 1m is allowed, the earthfilled area shall not be counted as an additional storey provided the overall aggregate building height complies with the maximum allowable building height measured from the allowable platform level.

Earthworks within the entire development site

Earthfill involving the entire development site may only be considered if the proposed earthworks are required to meet the technical requirements of PUB. Such earthfill may be allowed up to the Minimum Platform Level (MPL)1 stipulated by PUB.

1 Minimum Platform Level (MPL): The minimum 1st storey level to be provided within the site. The MPL is determined by the Public Utilities Board (PUB).

Retaining & Boundary Walls

Allowable Height of Retaining and Boundary Walls
Allowable Height of Retaining and Boundary Walls

The maximum allowable height for boundary walls is 1.8m.

High retaining walls shall be avoided wherever possible, particularly for small in-fill plots. If they have to be built and can be allowed, they shall meet the following requirements:

  • the height shall be less than 1.5m;

  • retaining walls higher than 1.5m may be considered due to site constraints and the need for extensive excavation;

  • the total visible height of the solid boundary-cum-retaining wall shall not exceed 2.8m, of which the solid boundary wall shall not exceed 1.8m.

If the retaining walls are to meet the MPL requirement stipulated by PUB for drainage purposes, the retaining walls along the site boundaries (except along boundaries that abut foreshore, roads, or waterbodies with drainage reserve equal to or more than 17.5m wide) need not be tiered as these are transitory, pending the redevelopment of the neighbouring land to the same MPL.