The Building Control Act aims to ensure that building works comply with standards for safety, accessibility, environmental sustainability and buildability. All building works, except those that are minor and exempted under the First Schedule of the Building Control Regulations, will require plan approval from the Commissioner of Building Control.
Building works refer to:
Erection, extension or demolition of a building
Alteration, addition or repair of a building
Provision, extension or alteration of any air-conditioning service or ventilating system in or in connection with a building,
and it includes site formation works connected with or carried out for the purpose of (a), (b) or (c).